Park Improvement Projects

Park Projects
Below are park projects that are in development, please click on the link to find additional details on each project.

Landa Park River Front Rehab
This project includes the replacement of the Wading Pool bridge and retaining walls along the Comal River and Landa Lake Dam repairs. More information on the Landa Park River Front Rehabilitation project.

Fischer Park
This project involves development of a 62 acre park. More information on the Fischer Park project.


New Braunfels 2013 Bond Program
 BOND.jpg

The citizens of New Braunfels passes a Bond Election on May 11, 2013 including $20 million for Parks, Recreation and Open Space Improvements.

For additional information on all four propositions, details on each project and status updates visit the 2013 Bond Program webpage.

Build Morningside 


 water study website.jpg

Preliminary Engineering Report for Reuse Water Project

New Braunfels Utilities in cooperation with the City of New Braunfels retained River
City Engineering, PLLC, to prepare a Preliminary Engineering Report (PER) for the development of a reuse water system for irrigation of the City’s park land, greenbelts, public irrigated landscapes, and athletic fields.

The PER was completed in March 2015.

Download the Preliminary Engineering Report (PDF 38.4 MB)

Parks Reclaimed Water Irrigation Feasibility Study
The City of New Braunfels Parks Reclaimed Water Irrigation Feasibility Study was completed in July 2011 by Espey Consultants, Inc. Study Participants included theCity of New Braunfels, New Braunfels Utilities (NBU), Guadalupe-Blanco River Authority (GBRA), Edwards Aquifer Authority (EAA) and the Texas Water Development Board.

The feasibility study was designed to give an analysis of the viability of the idea to use reuse water for parkland irrigation.
Download the Reclaimed Water Irrigation Feasibility Study (PDF 14.75 MB)


Park Improvements
Below are park improvements that are improving or updating existing City of New Braunfels Parks. 

Landa Park Pedestrian & Vehicular Bridges
 fred fields website.jpg

Repairs to the Gazebo Circle vehicular and pedestrian bridge from 2010 flood damage.   

Fredericksburg Fields
Painted buildings
Rebuilt Fields
Painted dugouts    
Irrigation installed on the Optimist Field

Prince Solms Park
Irrigation installed on the Disc Golf Course - Completed    
Disc Golf Signage being designed - In Progress 

Puppy Playland Dog Park
Phase one construction for the Puppy Playland Dog Park - Completed.
For information on future phases and fundraising efforts click here. 
This project is a joint effort between the New Braunfels Parks Foundation, New Braunfels Puppy Playland and the City of New Braunfels. 
Click here for more information on the Puppy Playland Dog Park rules.


Park Information
Click here for more information on all the parks and amenities available.